How it works

A clear, milestone-driven path

Delivery & construction workflow

1

Configuration

Select model, options, and pathway.

2

Site feasibility

Preliminary screening and specialist review.

3

Engineering & permitting

Design, engineering, and permit submission.

4

Manufacturing

Steel-framing kit production.

5

Site preparation

Foundation and site readiness.

6

Assembly

Trained crews assemble the kit.

7

Inspections & closeout

Final inspections and documentation.

Steel-framing system

Engineered steel components

FrameHouzz home kits and ModuSteel ADUs use steel framing designed for repeatable assembly. Final engineering, code compliance, and suitability are project-specific and subject to site review.

Do not assume hurricane-proof, fireproof, maintenance-free, code-approved, or permit-ready status without verified documentation.

Steel framing — conceptualConceptual rendering. Final design, materials, dimensions, and site conditions may vary.

Project milestone timeline

01

Inquiry received

02

Consultation scheduled

03

Preliminary site screening

04

Site documentation received

05

Feasibility review

06

Configuration approved

07

Proposal issued

08

Financing or lease decision

09

Contract executed

10

Design and engineering

11

Permit submission

12

Manufacturing scheduled

13

Site preparation

14

Kit dispatched

15

Assembly or construction

16

Inspections and closeout

Statuses come from the CRM or project-management system and do not imply completion until verified.